Tuesday, December 7, 2010

Back At Work Leveling

Layton and his partner were back at work yesterday leveling the floor. He said he'd be back this morning for more leveling. Clay said it would have to dry for a few days to get the moisture level down to ensure a good bond. At his suggestion, we're keeping the heater on to help with the drying. I told them yesterday that I'd rather have it right than fast. Here are some more pictures of the progress. I don't know why Scooter the cat always has to be in the picture.


No comments:

Post a Comment